Method Statements in Construction UK (2026 Guide + Free Template)

Method statements explain how construction work will be carried out safely, step by step. This guide shows what a method statement is, what it should include, and how to create one quickly using professional templates.

✔ Built for UK contractors   ✔ Editable templates   ✔ Instant download

What Is a Method Statement?

A method statement is a document that explains how a task will be completed safely. It outlines the sequence of work, equipment used, hazards, and control measures required to carry out the job.

In UK construction, method statements are commonly used alongside risk assessments to form RAMS (Risk Assessment Method Statements).

What Should a Method Statement Include?

  • Project details and site information
  • Scope of works
  • Step-by-step sequence of tasks
  • Tools, plant and equipment
  • Hazards and risks
  • Control measures
  • PPE requirements
  • Emergency procedures
  • Supervision and responsibilities

Why Are Method Statements Important?

Method statements help ensure work is planned properly and carried out safely. They reduce risk, improve communication on site, and demonstrate that work has been considered before it begins.

When Are Method Statements Needed?

Method statements are typically required before work starts, particularly for higher-risk construction activities. They are often reviewed by site managers, principal contractors, or clients before approval.

Common Mistakes

  • Copying generic templates without editing
  • No clear sequence of work
  • Missing hazards or controls
  • No supervision or responsibility section
  • Documents not reviewed before use

Simple Method Statement Example

Task: Installing internal stud walls

Process: Measure → Mark out → Fix track → Install studs → Board and finish

Controls: PPE, safe use of tools, manual handling precautions, supervision

Need RAMS Templates?

Method statements are part of RAMS. Learn how risk assessments and method statements work together.

READ RAMS GUIDE

Method Statement FAQs

What is a method statement?

A document explaining how work will be carried out safely.

Who writes method statements?

Usually the contractor or subcontractor performing the work.

Are method statements required?

They are commonly required on construction projects to demonstrate safe working procedures.

What is the difference between RAMS and a method statement?

A method statement explains how work is done, while RAMS combine this with a risk assessment.

Get Professional Method Statement Templates

Save time and produce professional site documents using editable templates built for UK construction.

SHOP METHOD STATEMENTS NOW ALSO READ: RAMS GUIDE