Method Statements Explained (UK Construction Guide 2026)

A method statement is a key construction safety document that explains how work will be carried out safely. This guide covers what method statements are, when they are required, and how to create them correctly in the UK.

A method statement is a step-by-step description of how a task is completed safely, outlining the process, risks, and control measures.

What Is a Method Statement?

A method statement describes how construction work is carried out safely. It outlines:

  • The sequence of work
  • Hazards involved
  • Control measures
  • Equipment and PPE required

It is often combined with a risk assessment to form RAMS (Risk Assessment Method Statements).

👉 Learn more about RAMS

---

Are Method Statements a Legal Requirement in the UK?

Method statements are not always legally required but are expected under UK health and safety regulations.

They support compliance with:

  • Health and Safety at Work Act
  • CDM Regulations
  • HSE guidance

Most contractors require method statements before work begins.

---

What Should a Method Statement Include?

  • Project and task details
  • Step-by-step work process
  • Identified hazards
  • Risk control measures
  • Required PPE
  • Emergency procedures

👉 Download Method Statement Templates

---

Why Are Method Statements Important?

  • ✔ Improve safety on site
  • ✔ Ensure consistent work processes
  • ✔ Help meet legal requirements
  • ✔ Support site audits and inspections
  • ✔ Reduce accidents and incidents
---

Who Is Responsible for Writing Method Statements?

The contractor or employer is responsible for preparing method statements.

Site managers must ensure they are followed and communicated to workers.

---

What Is the Difference Between a Method Statement and Risk Assessment?

  • Risk Assessment: Identifies hazards and risks
  • Method Statement: Explains how work is done safely

Together, they form RAMS.

---

Common Mistakes with Method Statements

  • Using generic templates without editing
  • Not updating for site conditions
  • Failing to communicate to workers
  • Missing key risks or steps
---

How Method Statements Link to Toolbox Talks

Method statements define how work should be done, while toolbox talks communicate this to workers on site.

👉 View Toolbox Talk Examples

---

People Also Ask

Do small jobs need method statements?

Yes, even small jobs benefit from clear safe working procedures.

How long does it take to write a method statement?

With templates, it can be done quickly and efficiently.

What happens if method statements are missing?

This can lead to unsafe work, failed inspections, or enforcement action.

---

More about method statements in UK construction

Method statements are widely used across UK construction sites to define safe systems of work. They help ensure that tasks are completed safely and consistently.

Construction companies rely on method statements to meet compliance requirements and maintain high safety standards.

---

Need ready-made method statements?

Download professional, editable templates built for UK construction sites.

Browse Templates